Building a new home can be challenging, and it comes with many questions about projects, including a plumbing rough-in. When it comes to plumbing rough-in FAQs, we have your answers!
How much is a plumbing rough-in for new construction?
Costs to rough-in plumbing for a new build will depend on the following factors:
- Where pipes are located
- How many bathrooms
- Cost and variety of plumbing materials
- Cost of a plumber (hourly wage or project fee)
It’s good to know as much as possible about new construction plumbing rough-in costs when you talk to a plumber about a new build project. When you receive a quote from a plumber, see if they’ve included labour and materials in their upfront costs.
What happens during a plumbing rough-in?
After a construction site is framed, the next stage is to complete the plumbing rough-in. So, what exactly is the rough-in?
A qualified plumber will identify each plumbing location in the new build during the rough-in. They will ensure that every plumbing line connects to a drainage point called the stack.
In order, this is the plumbing rough-in process:
- Line pipes get routed through wall cavities
- All pipe connections get made
- Vent stacks run to the roofline
- All water supply and drain lines get connected to sewer/septic systems
- Excavations made to connect pipes to external utilities
- Attach fixtures to the internal plumbing system, including drains, toilet flanges, and sanitary tees.
Some people question why fixtures are always the last step to be completed. There are two good reasons for this:
- Issues can arise with pipe and lines during the rough-in process, so any installed fixtures would have to be removed and re-installed, which is a costly delay.
- All plumbing rough-in work must be easily accessible to an inspector for approval before fixture installations are completed.
Following this process ensures that new construction builds get completed more smoothly.
How long does new construction plumbing take?
Smaller builds such as single bedroom and bathroom homes generally take five days for plumbing rough-in and installation of fixtures. However, the process often takes several weeks for larger projects or bigger houses with more bathrooms and plumbing lines.
What’s next following a plumbing rough-in?
Rough-ins happen before other installations, including plastering or drywall, insulating, or finishing (such as flooring) get installed. A local inspector is generally required to examine and approve rough-ins to ensure compliance with relevant building codes or ordinances.
Parting words regarding new construction plumbing rough-in
Most plumbing projects require skill, knowledge, and suitable materials, but new building plumbing and plumbing rough-ins need an expert. So please, don’t consider this a DIY situation!
A qualified plumber is reliable, but they are also your best bet in getting a job done right and preventing any problems in the future.