Montreal
Report Inaccuracy

Ville-Marie Tunnel Eastbound Ramps Closing

Ville-Marie Tunnel Eastbound Ramps Closing

MONTREAL, June 10, 2026 /CNW/ – The Ministry of Transport and Sustainable Mobility informs the public that the ramps leading from Rue de la Cathédrale, Rue Notre-Dame, and Boulevard Robert-Bourassa to the Ville-Marie Tunnel eastbound will be closed during the weekend of June 12, 2026.

These closures are required for maintenance and inspection work on a water main being carried out by the City of Montreal.

Traffic Disruption and Management

Route 136 (Ville-Marie Tunnel) Eastbound

Ramps from Rue de la Cathédrale, Rue Notre-Dame, and Boulevard Robert-Bourassa will be closed from Friday at 10 p.m. to Monday at 5 a.m.

Detours

Detours will be marked with temporary signage.

This work may be postponed due to inclement weather or operational constraints. Therefore, before heading out on the road, it is recommended to consult Québec 511, a practical tool for planning your trips, and to download the Québec 511 mobile app to activate notifications.

The Ministry thanks road users for their cooperation. For the safety of road users and workers, respecting the posted signage is essential.

Other articles from totimes.ca – otttimes.ca – mtltimes.ca

Share: Facebook X