One of the two launching beams is currently being assembled near Fairview Pointe-Claire. The beam is 105 meters long and can support up to 550 tons (about 100 elephants 🐘); it will soon enable the concrete segments of the elevated structure to be installed in the West Island.



Here is an example of the construction process
